Rough-in and finish plumbing for remodels and additions

Free QuoteSouthern California · Open 24/7

New construction, an ADU, a kitchen gut, a bathroom addition — all of it needs supply, drain, waste, and vent run correctly the first time, because the second time means opening a finished wall. We handle rough-in through final connection, size the lines for the fixtures you're actually installing, and work to the inspector's schedule rather than around it.

Our Process

1

Plan Review

We read the plans or walk the space, confirm fixture counts, and flag anything the layout will fight.

2

Rough-In

Supply, drain, waste, and vent are run and secured before the walls close.

3

Inspection

We pressure-test, call the inspection, and meet the inspector so nothing stalls your build.

4

Finish & Start-Up

Fixtures are set and connected, everything is run and checked, and the system is handed over.