
New Plumbing Installation
Rough-in and finish plumbing for remodels and additions
New construction, an ADU, a kitchen gut, a bathroom addition — all of it needs supply, drain, waste, and vent run correctly the first time, because the second time means opening a finished wall. We handle rough-in through final connection, size the lines for the fixtures you're actually installing, and work to the inspector's schedule rather than around it.
Our Process
Plan Review
We read the plans or walk the space, confirm fixture counts, and flag anything the layout will fight.
Rough-In
Supply, drain, waste, and vent are run and secured before the walls close.
Inspection
We pressure-test, call the inspection, and meet the inspector so nothing stalls your build.
Finish & Start-Up
Fixtures are set and connected, everything is run and checked, and the system is handed over.